Confirmed, directional, projected, or speculative

Power 12 Evidence Ledger and Planning Filter

Filter Power 12 planning through the strength of the available evidence without turning roadmap signals into invented specifications.

How much roadmap uncertainty can the project carry?

Power 12 has not been announced as a product. The planning question is whether the project can wait for stronger evidence or should act on supported Power 11 hardware now.

How the result is produced: Project urgency, planning horizon, and tolerance for unconfirmed evidence add fit points to acting now, preserving optionality, or monitoring the ledger.
Limit: No result predicts a Power 12 model, price, core count, clock speed, availability date, or IBM i release. Those facts do not exist publicly as confirmed product specifications.

Current Power 12 evidence ledger

The confidence label is part of the fact. Remove the label and the record becomes less useful.

Confirmed boundary 2026-09-19

IBM has not announced Power 12 product specifications

No IBM model, price, core count, clock speed, availability date, or sales manual has been published for a Power 12 product.

Planning implication: Use shipping Power 11 documentation for current purchases and keep future assumptions outside hard requirements.

IBM Power products

IBM-stated direction 2024-11-13

IBM has discussed a post-Power 11 chiplet direction

Public reporting attributes a hub-and-spoke chiplet direction for the generation after Power 11 to IBM Power processor leadership.

Planning implication: Preserve design optionality, but do not infer model-level specifications.

IT Jungle architect interview

IBM-stated direction 2025-04-14

Spyre has been described as part of Power 11 and beyond

IBM Power processor leadership publicly described Spyre continuity beyond the current generation without publishing a Power 12 product configuration.

Planning implication: AI inference remains a credible multi-generation theme, while accelerator form and performance remain unconfirmed.

IT Jungle AI acceleration report

Pattern-based projection 2025-04-08

A 2027 to 2028 window is a projection, not an announcement

Industry analysis extrapolates a future window from historical Power and IBM i release patterns.

Planning implication: Use the window for scenarios only. Do not delay a required project as though the date were committed.

IT Jungle roadmap analysis

Analyst speculation 2026-08-15

Process-node and packaging details remain speculative

Samsung process-node and 2.5D packaging combinations discussed in outside analysis have not been confirmed by IBM as Power 12 specifications.

Planning implication: Track the claim, but do not use it to size, price, or approve hardware.

Existing confidence-labeled record

A roadmap claim can change state

A useful ledger does more than collect predictions. It records when a claim appeared, who said it, how direct the source is, what the claim does not establish, and which planning decision would actually change if stronger evidence arrives.