The confidence label is part of the fact. Remove the label and the record becomes less useful.
Confirmed boundary
2026-09-19
IBM has not announced Power 12 product specifications
No IBM model, price, core count, clock speed, availability date, or sales manual has been published for a Power 12 product.
Planning implication: Use shipping Power 11 documentation for current purchases and keep future assumptions outside hard requirements.
IBM Power products
IBM-stated direction
2024-11-13
IBM has discussed a post-Power 11 chiplet direction
Public reporting attributes a hub-and-spoke chiplet direction for the generation after Power 11 to IBM Power processor leadership.
Planning implication: Preserve design optionality, but do not infer model-level specifications.
IT Jungle architect interview
IBM-stated direction
2025-04-14
Spyre has been described as part of Power 11 and beyond
IBM Power processor leadership publicly described Spyre continuity beyond the current generation without publishing a Power 12 product configuration.
Planning implication: AI inference remains a credible multi-generation theme, while accelerator form and performance remain unconfirmed.
IT Jungle AI acceleration report
Pattern-based projection
2025-04-08
A 2027 to 2028 window is a projection, not an announcement
Industry analysis extrapolates a future window from historical Power and IBM i release patterns.
Planning implication: Use the window for scenarios only. Do not delay a required project as though the date were committed.
IT Jungle roadmap analysis
Analyst speculation
2026-08-15
Process-node and packaging details remain speculative
Samsung process-node and 2.5D packaging combinations discussed in outside analysis have not been confirmed by IBM as Power 12 specifications.
Planning implication: Track the claim, but do not use it to size, price, or approve hardware.
Existing confidence-labeled record